Mix | 13.6

Fixed gantry loading/unloading system for 13.6 m beams

Loading/unloading unit for prefabricated construction and timber structures

Challenges Addressed

Handling of large beams, planks, and panels (up to 13.6 meters in length)

Proposed Solution

Automatic loading/unloading unit operating without operator assistance.
The system positions itself above the materials to be handled, enabling:
• Stacking, destacking, handling, and separation of materials pre-positioned in storage areas,
• Feeding of machining centers, production lines, and other handling systems
• Transfer of semi-finished and finished products to automated storage systems
• Organization of storage areas (pick & place warehouse)

Solution Advantages

  • Robustness and reliability
  • Versatility (stacking, destacking, conveying, optimizing, and feeding operations)
  • Fast return on investment

Technical Specifications

Max glulam beam dimensionsmm 300 x 13.600
Min glulam beam dimensionsmm 150 x 13.600
Thicknessmm 12 – 200
Cycles per minuteDepending on the production cycle
Stack heightmm 800 – 900
Max board/beam weightkg 240
Installed powerKw 23,5 – Hp 31.33
Compressed air consumptionNL/min 1400-2300 – CFM 49.44-81.22

Designed for

  • Processing lines for large beams, planks, and panels
  • Timber prefabricated construction and structural timber manufacturing

Contact us without obligation!

Fill in the contact form with your data and we will contact you as soon as possible. Fields marked with * are mandatory.

This field is for validation purposes and should be left unchanged.
Fullname(Required)